EPTT, Hydro Power, Steel Manufacturing and Telecomunication by Alamdar Engineering (Pvt.) Ltd.
Project Accomplished:
Project: 8  | 
                          Transmission Arrangement for Power Dispersal of Ghazi – Barotha Hydropower; Construction of Barotha – Rewat 500Kv Transmission Line  | 
                        
Client  | 
                          Water & Power Development Authority, Pakistan  | 
                        
Main Contractor  | 
                          Nazir & Co. (Pvt) Limited  | 
                        
 Scope 
  | 
                          Stringing works including: 
 
  | 
                        
Status  | 
                          COMPLETED IN 2005  |